Step-by-step stackable surgical guides with immediate loading and LEGO-bridge bar

Full-arch mandible digital planning for immediate loading with stackable guides and LEGO-bridge temporary CoCr bar intraoral welding implementation.

                 

The use of this concept allows the operator to perform surgery, implant placement and immediate temporary loading supported with a metal (CoCr) bar for extra support all in one operation, enabling the patient to have a one-day surgery and teeth in the same visit.

              

The procedure:

                  

 

Case by Dr.Maxym Prytula

Made in ImplaStation

TO ALL ARTICLES